Arram Consultores

Cabecera de la página

Arram Consultores

Areas

Energy

Cabecera

MANCHASOL / EXTRESOL

Location:
Alcázar de San Juan
Ciudad Real (Spain)
Torre de Miguel Sesmero
Badajoz (Spain)
Execution Timescale:
September 2007 to September 2011
Budget Executed:
1.250.000.000 €
Marca

Construction of five 49.9 MW
solar thermal plants

Each thermal solar plant has a power output of 49.9 Mw and will use cylindrical parabolic reflector technology. Each plant will have one solar farm measuring 510,120 m2 capable of generating 175 million kilowatts of purely solar electricity. Thanks to their 6-hour thermal storage capacity plus 25% security, each project will provide electric power supplies to the grid without fluctuations or interruptions, thereby supporting the electric grid's stability during 3,525 hours of nominal load.

Pie de la página

Services

BADAJOZ
Paseo de San Francisco 2-A
06002 Badajoz
Phone: 924 207 083
Fax: 924 207 085
MADRID
Avenida de Europa 2
Parque del Oeste 28922 Alcorcón
Phone: 916 891 937
Fax: 916 891 957