Arram Consultores

Cabecera de la página

Arram Consultores

Areas

Energy

Cabecera

SOLAR PARKS OF EXTREMADURA SPEX

Location:
Mérida y Don Álvaro,
Badajoz (Spain)
Execution Timescale:
May 2008 to September 2010
Budget Executed:
250.000.000 €
Marca

Construction of a 30 Mw photovoltaic solar plant equipped with two-axis tracking

This project consists of a photovoltaic solar plant having a nominal power output of 30,000 kV and made up of 1,975 two-axis solar trackers, the world’s best with this configuration.

Taking into account that an average Spanish home’s consumption is of 3,300 kWh per year, the electricity produced by this photovoltaic system connected to the electricity grid translates to 5,786 times that level of consumption.

The solar farm’s entry into service will mean that a total of 2,400 t/year of oil will not have to be imported.

Pie de la página

Services

BADAJOZ
Paseo de San Francisco 2-A
06002 Badajoz
Phone: 924 207 083
Fax: 924 207 085
MADRID
Avenida de Europa 2
Parque del Oeste 28922 Alcorcón
Phone: 916 891 937
Fax: 916 891 957