Phase 1: Construction of a glass packaging factory in the locality of Villafranca de los Barros, Badajoz, Spain.
The initial project promoted by this Portuguese business group consisted in the construction of a glass production factory in the municipality of Villafranca de los Barros, with a production capacity which will go over 405 t of soda glass per day. the built-up area of buildings used for administrative and production purposes was 24,257.28 m2 , and the built-up area for storage, 25,365.11 m2
Phase 2: Extension of a glass packaging factory in the locality of Villafranca de los Barros, Badajoz
The project for the extension implied an increase of the production capacity of the factory, from 405 t per day to 825 t per day. The built-up area for buildings used for administrative and production purposes was 6,870.45 m2 , and the built-up area for storage, 25,365.11 m2 .
The scope of the services that Arram provided throughout the different phase was as follows:
Phase of final design
Counselling the client about the design and layout
Counselling the client throughout the process
Design and definition of the civil works to be done
Design and definition of the utilities
Phase of project management
Counselling about the selection of suppliers
Supervision and control of civil works as well as utilities execution
Permits and legalisations
Obtaining all the permits prior to the execution of the plant, as well as the legalisation of the same before all the competent authorities and the processing of the corresponding aids